    Fuel Infrastructure Works Consultancy

    Specialist advice at the very start, before project planning begins. BMS Group helps you understand your existing fuel infrastructure, survey the site and define the requirements, so your project starts from a clear, realistic scope.
    • Technical Support & Consultancy
    • Advice on whole fuel infrastructure
    • Surveys & Drawings
    • Visibility Reports
    • Full RIBA package
    45+ Years Combined Experience
    Nationwide Coverage & Worldwide
    CompEx & OFTEC Engineers
    Trusted by Many Sectors

    How BMS Works Consultancy Supports You Before Planning Begins

    Early-Stage Specialist Advice

    You do not need to arrive with a finished fuel-system solution. BMS Group gets involved before project planning begins, helping your team work out what is needed and why.

    Understand & Survey

    BMS reviews your existing fuel infrastructure and surveys the site to establish condition, constraints and risks, giving you a reliable baseline before any decisions are made.

    Define the Requirement

    We help you set the scope, priorities and practical options, and develop an early solution and equipment approach that fits the site, your requirements and your wider plans.

    Ready for Project Planning

    The consultancy gives your project team a clear, well-defined starting point. Where required, BMS can continue into project planning, coordination and delivery.

    What Is Fuel Infrastructure Works Consultancy?

    Works consultancy is the very first stage of a fuel infrastructure project, before project planning begins. BMS Group helps you understand what you have, what needs to change and what the realistic options are, so later planning and design decisions are built on clearly defined requirements.

    Works Consultancy and the RIBA Plan of Work

    The RIBA Plan of Work is the UK framework most design teams use to organise a building project into eight stages, from 0 (Strategic Definition) to 7 (Use). BMS works consultancy sits at the front end, across Stages 0–2: Strategic Definition (why the fuel infrastructure needs to change), Preparation and Briefing (understanding the existing system and surveying the site) and Concept Design (defining the scope, options and early equipment approach). Using the same stages as your architect and project manager means the fuel elements are planned in step with the rest of the scheme.

    How BMS Fits Into Your Project Team

    BMS can support your existing project team as the specialist fuel-infrastructure adviser, providing fuel-system advice and early input alongside your PM, architect, M&E consultant and other advisers. Where required, BMS can take a more active role, planning and coordinating the specialist fuel-infrastructure package with designers, suppliers, civils, electrical, controls and installation teams.

    When Should I Involve BMS?

    As early as possible, and especially if you know something needs replacing but are not sure what, your fuel infrastructure is ageing or poorly documented, you are considering a new facility or major upgrade, or your wider team needs specialist fuel-system input before the project is planned.

    The BMS RIBA Stage Package: From Consultancy Into Delivery

    At the end of Stages 0–2 BMS provides a fuel-infrastructure package your team can build into its stage outputs and project brief: survey findings, defined requirements and priorities, practical options, an early equipment approach and the civils, electrical and controls interfaces to be coordinated. Where BMS is appointed to continue, the same understanding carries through Stage 3 (Spatial Coordination), Stage 4 (Technical Design and specialist packages), Stage 5 (Manufacturing and Construction), Stage 6 (Handover, testing and commissioning) and Stage 7 (Use, maintenance and future upgrades).

    Thinking About a Fuel Infrastructure Project?

    Speak to BMS before project planning begins. Our works consultancy helps you understand your existing infrastructure, define the requirement and start your project on the right footing.

    • Understand your existing infrastructure
    • Survey the site, condition and constraints
    • Define the requirement and options
    • RIBA full package

    Powered by Industry-Leading Technology

    Why Choose BMS

    • Specialist adviser
    • Early Stage Advice
    • Continuity into planning & delivery

    End-to-End Service

    From design and installation to calibration and maintenance, we deliver complete liquid and fuel management solutions.

    Specialist Hazardous Area Engineers

    Our mechanical and electrical engineers are qualified to work in fuel and chemical environments.

    Proven Industry Partnerships

    Official distributor and service partner for leading global manufacturers and technology providers.

    What Our Clients Say About Us

    “
    Firstly, I just wanted to thank you all for your help and can-do attitude at Bulk Meter Services that you have provided during my time with Aspire. Today I am retiring (9th October) and wanted to convey my appreciation to a very professional and personable organisation. Your help and expertise are greatly appreciated by my colleagues and me. Can you convey my thanks to your back-office and technicians, as they have always been a pleasure to work with. Again, a big thank you and take care, everybody.
    Jim, PPM Administrator, Aspire

    Frequently Asked Questions

    What is works consultancy and when does it happen?

    Works consultancy is the earliest stage of a fuel infrastructure project, before project planning begins. It focuses on understanding the existing system, surveying the site and defining what the project needs to achieve.

    Do we need a finished design before contacting BMS?

    No. You do not need to arrive with a finished fuel-system solution. BMS Group helps your team establish what is needed and develop a practical solution and equipment approach. BMS can work alongside your PM, architect, M&E consultant and other advisers, or take a more active role coordinating the specialist fuel package where required.

    What does the site survey include?

    BMS reviews and records the existing tanks, pipework, dispensing and controls, and establishes their condition, site constraints and risks, giving you a reliable baseline before any decisions are made.

    Which RIBA stages does BMS works consultancy cover?

    Works consultancy covers RIBA Stages 0–2: Strategic Definition, Preparation and Briefing, and Concept Design. BMS can then continue to support the fuel-infrastructure package through Stages 3–7, from Spatial Coordination and Technical Design through construction, handover and use.

    What is included in the BMS RIBA stage package?

    The package gives your project team the fuel-infrastructure information it needs for its RIBA stage outputs and brief: survey findings, defined requirements and priorities, practical options, an early equipment approach and the interfaces with civils, electrical and controls.

    Can BMS continue once project planning begins?

    Yes. Where required, BMS can continue into project planning, coordination, procurement and delivery, through to commissioning, handover and ongoing support.